Two new, high-performance gas turbine plants with heat recovery steam generators are being built in the Gutleutviertel district. Here, heat and electricity will continue to be generated simultaneously. The combined heat and power plant, which is mainly operated with hard coal, is expected to be completely converted to initially natural gas as early as 2026. In the course of the conversion and modernization, the existing coal-fired units will be replaced by two new units, each with a gas turbine with heat recovery steam generator. These modernizations contribute to the decarbonization of energy generation: In this way, the CO₂ emissions of the generation park can be continuously reduced. In the future, the focus will be on the use of CO₂-free gases - such as climate-neutral hydrogen.

  • Foundations for the boiler houses
  • the new construction of the GT machine house including steel construction and the GT compressor including foundations
  • the new construction of the ancillary facilities & enclosures for the main transformer as well as the facades

About us

Our company is looking back on a successful building tradition since 1892. Heitkamp stands for the optimal interaction of engineering know-how and constructional realisation.

Contact

HEITKAMP
Industrial Solutions GmbH
Bonsiepen 9 -11
45136 Essen, Germany

+49 (0) 201 / 8 36 90 - 0

+49 (0) 201 / 8 36 90 - 199

Socials

© 2026 HEITKAMP Industrial Solutions GmbH. All Rights reserved.
Settings saved
Privacy settings

Please make a selection to continue
We use cookies and similar technologies to improve your experience on our website. Some cookies are necessary for basic functionality, while others help us analyze usage and optimize our services. For detailed information, please see our privacy policy.

user_privacy_settings_expires

Domain name: heitkamp-solutions.com
Procedure: 30 days
Storage location: Localstorage
Description: Saves the privacy level settings from the cookie consent tool “Privacy Manager.”

user_privacy_settings_expires

Domain name: heitkamp-solutions.com
Procedure: 30 days
Storage location: Localstorage
Description: Stores the storage duration of the privacy level settings from the cookie consent tool “Privacy Manager.”

ce_popup_isClosed

Domain name: heitkamp-solutions.com
Procedure: 30 days
Storage location: Localstorage
Description: Stores that the popup (content element - popup) was closed by a click of the user.

onepage_animate

Domain name: heitkamp-solutions.com
Procedure: 30 days
Storage location: Localstorage
Description: Stores that the scroll script for the one-page navigation has been started.

onepage_position

Domain name: heitkamp-solutions.com
Procedure: 30 days
Storage location: Localstorage
Description: Saves the offset position for the one-page navigation.

onepage_active

Domain name: heitkamp-solutions.com
Procedure: 30 days
Storage location: Localstorage
Description: Saves that the current page is a “one-page” page.

view_isGrid

Domain name: heitkamp-solutions.com
Procedure: 30 days
Storage location: Localstorage
Description: Saves the selected list/grid view in the demo CarDealer / CustomCatalog List.

portfolio_MODULE_ID

Domain name: heitkamp-solutions.com
Procedure: 30 days
Storage location: Localstorage
Description: Saves the selected filter of the portfolio filter.

Eclipse.outdated-browser: "confirmed"

Domain name: heitkamp-solutions.com
Procedure: 30 days
Storage location: Localstorage
Description: Saves the status of the “Outdated Browser” notification bar.
You are using an outdated browser. The website may not be displayed correctly.